I. Project Name: R&D and Production Building Construction Project (Third Floor) II. Project Overview: Our company’s R&D and Production Building Construction Project (Third Floor) was originally designated as a reserved workshop. It is planned to house a production facility for the 13-valent pneumococcal vaccine and the pertussis vaccine, along with associated supporting infrastructure. To date, we have obtained the “Project Filing Certificate” issued by the Daxing District Bureau of Economy and Information Technology (No. Jingxing Jingxinwei Bei [2019] No. 29), the “Approval of the Environmental Impact Report” issued by the Beijing Municipal Ecology and Environment Bureau (No. Jinghuan Shen [2019] No. 131), and the “Construction Engineering Construction Permit” issued by the Daxing District Housing and Urban–Rural Development Commission (No. 2020 Shi (Da) Zhuang Zi No. 9318). Currently, purification‑grade interior fit‑out work is underway.

I. Project Name: R&D and Production Building Construction Project (Third Floor)

II. Project Overview:

Our company’s R&D and production building project (third floor), originally designated as a reserved workshop, is planned to house a 13-valent pneumococcal and pertussis vaccine manufacturing facility along with associated supporting infrastructure. We have now obtained the Project Filing Certificate issued by the Daxing District Bureau of Economy and Information Technology (No. Jingxing Jingxinwei Bei [2019] No. 29), the Approval for the Environmental Impact Report issued by the Beijing Municipal Ecology and Environment Bureau (No. Jinghuan Shen [2019] No. 131), and the Construction Engineering Construction Permit issued by the Daxing District Housing and Urban–Rural Development Commission (No. 2020 Shi (Da) Zhuang Zi No. 9318). Currently, cleanroom renovation work is underway, with completion and official commissioning scheduled for December 2020. Equipment commissioning is planned for October. At present, it is necessary to increase the electrical capacity of the distribution room in the R&D and production building.

III. Scope of the Tender:

This tender pertains to the second phase of the distribution project and excludes external works; only internal works will be subject to tendering. The electrical construction requirements for this tender are as follows:

1. High-Voltage Section: This includes the wiring from the high-voltage transformer cabinet to the transformer, encompassing cable trays, high-voltage cables, and the transformer itself, as well as the procurement of related equipment and materials. The high-voltage transformer cabinet was already installed during Phase I construction.

2. Low-Voltage Section: Includes the foundation for low-voltage switchgear, installation of low-voltage switchgear, installation of busbar bridges, equipment commissioning, etc., with the demarcation point at the terminal blocks of the low-voltage switchgear, and encompasses the procurement of related equipment and materials.

3. Simplified diagram of boundary demarcation.

   

4. The construction work shall comply with the following specifications.

l GB 7251 “Low-Voltage Switchgear and Controlgear Assemblies”

l JB/T 9661 “Low-Voltage Withdrawable Switchgear Assemblies”

l GB 14048 “Control Equipment for Low-Voltage Switchgear”

l GB4942 “Protection Degrees of Enclosures for Low-Voltage Electrical Appliances”

l GB3047 “Basic Dimensions of Panels, Frames, and Cabinets”

l GB 9466 “Basic Test Methods for Low-Voltage Switchgear and Controlgear Assemblies”

l GB 2681 “Color Coding of Conductors in Electrical Switchgear and Controlgear Assemblies”

l GBZ 1-2010 Hygienic Design Standards for Industrial Enterprises

l GB 5226.1-2002 Safety of Machinery — Electrical Equipment of Machines — Part 1: General Requirements

l GB-8196-87 Safety Requirements for Machine Guarding Devices

5. Time requirement: Complete the power supply work by October 20.

6. The Contractor shall be responsible for handling all procedures related to the commencement of works, construction, acceptance, and power supply and generation (including those with the Municipal Power Supply Bureau, the Daxing District Power Supply Bureau, and other relevant authorities) and shall bear the associated costs.

7. Quality Requirements: All equipment and installation works shall comply with the design specifications and current national standards, as well as all applicable requirements for product grid‑connection approval issued by the Beijing Power Supply Authority. The products must be of reliable quality, feature advanced engineering designs, and ensure that the project successfully passes acceptance inspection by the power supply bureau and achieves successful power generation.

8. All equipment must comply with the requirements of the Beijing Municipal Bureau and the Daxing District Power Supply Authority. During the engineering acceptance conducted by the Daxing District Power Supply Authority, if the acceptance is affected by defects inherent in the equipment, the contractor shall unconditionally rectify such defects until compliance is achieved, and shall bear all resulting losses and expenses.

IV. Registration Notes:

1. Participating entities shall submit the following documents: the business license of the legal entity, qualification certificates, the safety production license, a certificate of the legal representative or a power of attorney issued by the legal entity, and copies of identification documents—two sets in total, with all copies stamped with the official seal of the entity—and shall clearly indicate the company’s registered capital.

2. Entities participating in the registration must possess the relevant professional qualifications.

3. Registration requires providing the organization’s contact person and contact information; the contact person must be the project leader or an designated business liaison, and a 12-month social security certificate must be submitted.

4. The tendering entity will review the qualification documents submitted by registered entities, giving priority to those with relevant project experience, and will conduct further discussions and on-site inspections with the shortlisted candidates.

5. Beijing Minhai Biotechnology Co., Ltd. was established in 2004 and is a wholly owned subsidiary of Shenzhen Kangtai Biological Products Co., Ltd. (a publicly listed company). For more information, please visit the company’s website.

6. Participating organizations must first conduct technical discussions with our institution.

V. Registration Method: Please send the above materials in electronic format to the email address lijianchun@biominhai.com.

VI. Registration Deadline: 5:30 p.m., August 10, 2020.

Hereby announced!

 

 

Beijing Minhai Biotechnology Co., Ltd.

2020 year 07 month

Recommended Reading


Batch Release Status of the Company’s Products in 2026


The company's product 2026 annual batch issuance situation is as follows:

2026-07-23

Good News | Another Star Award! Minhai Biotechnology has once again been recognized as a “Five-Star Green Credit Enterprise” in Daxing District.


Recently, the Daxing District Bureau of Ecology and Environment completed the fifth round of corporate green credit rating for 2025 and officially released the “2025 Daxing District Green Credit Enterprise Directory.” Thanks to its robust environmental management system, consistent compliance performance, and outstanding achievements in energy conservation and carbon reduction, Minhai Biotechnology has once again been awarded the region’s highest “Five-Star Green Credit Enterprise” rating. The Daxing District’s corporate green credit assessment covers five major categories—environmental compliance, pollution control and emission reduction, low‑carbon circular economy, scientific management, and social contribution—comprising a total of 30 sub‑indicators. With stringent standards and comprehensive evaluation, the program employs dynamic review and a veto‑based mechanism, with the Five‑Star rating representing the highest level of ecological credit in the district.

2026-07-15

Good News | The Party Branch of Minhai Biotechnology has been awarded the “Two Excellences and One Pioneer” honor in Beijing’s emerging sectors, as well as a park‑level commendation.


Recently, Beijing held a grand commendation conference for the “Two Excellences and One Pioneer” initiative in emerging sectors. The “Two New” Working Committee of the CPC Beijing Municipal Committee recognized outstanding Communist Party members, exemplary Party affairs workers, and advanced primary-level Party organizations across the city’s emerging fields. The Party branch of Beijing Minhai Biotechnology Co., Ltd. was honored as an advanced primary-level Party organization in Beijing’s emerging sectors. Wu Chengyu, the branch secretary, attended the ceremony in person to receive the award. At the event, the Party flag flew proudly amid a solemn atmosphere, and the awardees, adorned with honor ribbons and holding certificates and medals, jointly witnessed this prestigious municipal recognition. This designation as an advanced primary-level Party organization at the municipal level represents the “Two New” Working Committee of the Municipal Party Committee’s high appraisal of the Minhai Biotechnology Party branch.

2026-07-09