Search

中文 / English

Address: No. 35, Simiao Road, Daxing Biomedical Industrial Base, Zhongguancun Science Park, Daxing District, Beijing
 Copyright: Beijing Minhai Biological Technology Co., Ltd.    京ICP备10007676号-1   Powered by  www.300.cn Beijing    Beijing Public Security No. 110115000037 Internet Drug Information Service Qualification Certificate (Beijing) Non-operating 20150173           

Contact

Administrative Office: 010-59613600
Supplier consultation: 010-59613585
Recruitment: 010-59613547
Marketing: 010-59613639
Medical support: 010-57864983

                             010-59613669

400 :4001899806

Links:

>
>
>
Description and public disclosure of the public participation in the environmental impact assessment of the construction project of Minhai Biological New Vaccine International Industrial Base (Phase 1)

Description and public disclosure of the public participation in the environmental impact assessment of the construction project of Minhai Biological New Vaccine International Industrial Base (Phase 1)

Release time:
2019/03/13
Page view

According to the requirements of the "Environmental Impact Assessment Public Participation Measures", the full text of the "Environmental Impact Assessment Report for the Construction Project of the New Marine Vaccine International Industrial Base (Phase I)" and the public participation statement are now published. Instructions for participation are as follows.

  1 Overview

The construction project of Minhai Biological New Vaccine International Industrial Base (Phase I) is located in Xing Biomedicine Industrial Base. The four terminals are: north side to Simiao Road, south side to the planned land boundary, west side to Xiangrui Street, east side to Tianfu Main street, the project land scale is 90013.218m2, the total construction area of ​​the first phase is 149320m2, of which the above-ground building scale is 105420m2, the underground building scale is 43900m2; the floor area ratio is 1.17; the building density is 27.70%; the green area ratio is 31.10%; the control height is 36 meters. Annual production of 25 million doses of pneumococcal conjugate vaccine; 20 million doses of adsorbed cell-free leukoderma + inactivated poliomyelitis + Haemophilus influenzae type b vaccine; 20 million doses of vaccine, 5 million doses of live attenuated varicella varicella combined vaccine and 10 million doses of lyophilized live attenuated varicella vaccine. The working system is a one-shift system. The daily working time is 8 hours, and the annual working time is 230 days. The project has a capacity of 1,000 people.
 
According to the "People's Republic of China Environmental Protection Law", "People's Republic of China Environmental Impact Assessment Law" and "Construction Project Management Regulations" and other regulations need to carry out environmental impact assessment work, so on January 25, 2019, Linpu Hua Holdings Co., Ltd. was commissioned The project of our unit conducted an environmental impact assessment. Within 7 days of signing the contract, the first environmental impact assessment information was published on the website of Beijing Minhai Biological Technology Co., Ltd. on January 25, 2019, and no public opposition was received during the publicity period. ; On February 25, 2019, the draft of the "Environmental Impact Report on the Construction Project of the International Marine Vaccine International Base (Phase I)" was completed and the solicitation of the environmental impact report on February 25, 2019 The draft of the opinion was published simultaneously on the website of Beijing Minhai Biological Technology Co., Ltd. and Daxing News, and also at the main gate of Minhai, Beizangcun Town, Lijiayao Village, Liyuan Village, Pigezhuang No.1 Village, Poly Spring School, Xiyue The publicity column was posted in the spring. During this period, the newspaper published it twice, and the relevant opinions were collected within 10 working days of soliciting public opinions. At the same time, this public participation statement was compiled.

  Information disclosure of the first environmental impact assessment

  2.1 Public content and date

  On January 25, 2019, the first environmental impact assessment information was published on the company's website, and the publicity is as follows:

 
(I) Construction project name: Construction project of Minhai Biological New Vaccine International Industrial Base (Phase I)
 
(2) Location: Daxing Biomedical Industrial Base, Daxing District, Zhongguancun Science and Technology Park, Daxing District, Beijing, 053-039, 040, 043, 044, east to Tianfu Street, south to the planned land boundary, west to Xiangrui Street, north to Si Miao Road.
 
(3) Construction content: The total construction area of ​​the first phase is 149320m2, of which the above-ground building scale is 105420m2 and the underground building scale is 43900m2; the floor area ratio is 1.17; the building density is 27.70%; the green area ratio is 31.10%; the control height is 36 meters. Annual production of 20 million doses of combined cell-free leukoplakia inactivated poliomyelitis and Haemophilus influenzae type b vaccine; 25 million doses of pneumococcal conjugate vaccine; Mabella varicella series vaccine: Mabira combined attenuated live vaccine Agent, 5 million doses of attenuated live attenuated varicella and chickenpox vaccine, and 10 million doses of lyophilized live attenuated varicella vaccine.
 
(4) Name of construction unit: Beijing Minhai Biological Technology Co., Ltd.
 
Contact: Xia Zhanxiong
 
Telephone: 010-59613634
 
Email: xiazhanxiong@biominhai.com
 
(5) Compiling unit of environmental impact report: Puhua Holdings Co., Ltd.
 
(6) Web link for public comment form: http://www.biominhai.com/xwzx_xi/newsId=347.html
 
(7) Ways and means of submitting public comment forms.
 
Phone: 010-59613634
 
Email: xiazhanxiong@biominhai.com
 
In the process of preparing the draft of the environmental impact report, the public can submit opinions related to the environmental impact assessment to the construction unit.
 
2.2 Disclosure
 
2.2.1 Network
 
Mainly adopted the online platform for publicity. On January 25, 2019, the project was publicized for the first time on the official website of Minhai Biology. According to the requirements of the measures, the method of publicity is through its website, the public media website where the construction project is located or the relevant government website where the construction project is located. In this project, the official website of Minhai was used, and the time and platform for publicity met the requirements in the measures.
 
Public URL: http://www.biominhai.com/xwzx_xi/newsId=346.html
 
2.2.2 Other
 
There is no other way.
 
2.3 Public comments
 
Did not receive relevant public comments and suggestions for this project.
 
3 Publicity of the draft for comments
 
3.1 The content and time limit of the announcement
 
On February 25, 2019, the company publicized the draft for comments.
 
According to the relevant provisions of the "Law of the People's Republic of China on Environmental Impact Assessment" and the Ministry's Order No. 4 "Public Participation Measures for Environmental Impact Assessment", the information on environmental impact assessment of construction projects is now disclosed to the public as follows:
 
(1) Baidu network disk address of the full text of the consultation draft for environmental impact report:
 
Link: https://pan.baidu.com/s/1FJZbW9dheUlA-29VbAcDQQ Extraction code: azip
 
The location of the construction unit and the location of the EIA unit provide paper reports for public inspection
 
(2) The scope of public consultation:
 
The public within a 2.5km rectangular area around the project site.
 
(3) Web link for public comment form:
 
http://www.biominhai.com/xwzx_xi/newsId=347.html
 
(4) Ways and means of public opinion;
 
①You can fill out the electronic form of the public comment form and send it to xiazhanxiong@biominhai.com by email;
 
②The public comment form can be printed and mailed to the location of the construction unit: No. 35, Simiao Road, Daxing Biomedical Industrial Base, Zhongguancun Science and Technology Park, Daxing District, Beijing 102629
 
③Fax can be sent: 010-59613636
 
(5) The start and end time of public comments.
 
February 25, 2019-March 11, 2019
 
(6) Name of construction unit: Beijing Minhai Biological Technology Co., Ltd.
 
Contact: Xia Gong
 
Telephone: 010-59613634
 
Email: xiazhanxiong@biominhai.com
 
3.2 Publicity method
 
3.2.1 Network
 
The solicitation of the environmental impact report was published on the Minhai Biology website on February 25, 2019. The publicity time is 10 working days. The Minhai Biology website belongs to the official website of the project construction unit. 》 The requirements in the public announcement URL link are: http://www.biominhai.com/xwzx_xi/newsId=350.html
 
3.2.2 Newspaper
 
The contents of the public opinion draft for the project's environmental impact report were publicized on February 26 and March 8, 2019 in Daxing News, which was published by the Beijing Daxing Newspaper. For the publications that are generally accessible to the public, the "Daxing Daily" was selected as the carrier for the public consultation of this consultation draft to meet the requirements in the "Measures".
 
3.2.3 posted
 
From February 25, 2019 to March 8, 2019, the company was located in Beizangcun Town, Lijiayao Village, Liyuan Village, Pigezhuang No.1 Village, Poly Spring School, Xiyue Spring Promotion Board and the north side of the project location. Post on the outside wall.
 
3.2.4Other
 
The company provided the on-site inspection text of the "Environmental Impact Report on the Construction Project of the International Marine Vaccine International Base (Phase I)" of the existing plant and the EIA preparation unit, and no inspection request was received within 10 working days of publicity.
 
3.4 Public opinion
 
No public feedback form was received during the public comment period.
 
4 The handling of public comments
 
4.1 Overview and analysis of public comments
 
The project did not receive a public feedback form during the first publicity and public comment period.
 
4.2 Adoption of public opinions
 
Although our unit did not receive feedback from the public during the project publicity period, in the preparation of the report, corresponding environmental protection measures have been set for exhaust gas, wastewater, and solid waste, which can meet the requirements of meeting the discharge standards.
 
4.3 Non-acceptance of public comments
 
There is no unadopted situation.
 
5 Other
 
In accordance with the "Environmental Impact Assessment Public Participation Measures" (Ministry Order No. 4), our unit archived and archived the original questionnaires, publicized newspapers, undertakings and this public participation survey report collected by this public reference, For the public and environmental management departments to view.

annex:

The full text of "Environmental Impact Assessment Report for the Construction Project of Minhai Biological New Vaccine International Industrial Base (Phase I)" Baidu.com

https://pan.baidu.com/s/19P42bNMpJGvmyLyQRLaqHw   Extraction code:5s0s 

Xiàzài dìzhǐ:
 
download link: